321-454-7300

Request a Free Consultation

News & Events

Stay Up To Date

Project Spotlight – White Surf Condominium

Balcony Demolition & Corroded Steel

Our crews are working carefully to demolish the balconies, floor by floor in an alternating pattern, ensuring structural stability during the process (see image #03). In image #05, the severity of corroded steel reinforcement is clearly visible—an important reminder of why timely restoration is critical in coastal environments.

Structural Reinforcement & Inspection

As the project moves forward, our focus shifts to reinforcement preparation and epoxy set dowel installation. During our latest inspections:

  • Most tensile bars showed attenuation beyond 20%, requiring supplemental reinforcement

  • All dowels are being installed in accordance with ACI (American Concrete Institute) guidelines

  • Keystone conducted pre-dowel inspections to verify minimum embedment depths and ensure each drilled hole is properly cleaned and free from bond-inhibiting debris

  • The crew has mechanically cleaned all exposed reinforcing steel, ensuring a strong bond and long-lasting repairs

What’s Next

Stay tuned for upcoming uploads showing:

  • Concrete pre-pour and pour inspections

  • Waterproofing application

  • Guard rail installation

  • Final paint finishes

We’re proud to help safeguard and enhance the White Surf Condominium! Contact us today to schedule a free consultation (321) 454-7300